Life is in the way this week. Thinking about preparing the space for the new tool.


Spent two days ripping up the carpet and the wall behind where the new tool will go. With the wall open I can add outlets to plug things in and a light switch by the "room." Plans included 3/4" plywood on the floor to help spread the load over the +100-year-old flooring (more than 350lb and vibration on a 17"x17" base).


Mill shipped. Two packages coming freight (mill & stand) and all the "needed" accessories coming UPS.

Short week due to other issues.