• This was a domestic week.
  • Shop work on the servo brackets. Need to hog out the extra material to finish the required 20 arms.
  • I'm committed to where the Unicorn LED arrays and traffic monitor will be located. I cut slots in the layout baseboard locating where the cables will pass through from bottom to top..