• A day of testing corrected lots of typos in the signal lookup tables.
  • Started the class for trains. Another lookup table to define which assets (turnouts, crossover, blocks of track) are needed to move from one block to the next.
  • Milling more servo arms and angle brackets. Got in a hurry. Low output.